CCTV, access & alarmTime Attendance & Door Access System Installation at Nilai
Unprofor Security Services Sdn Bhd
July 2026
- Face recognition access system installation
- Door access system installation with breakglass & Em-lock
- Power cabling & alarm cable installation
- Testing & configuration
IT supply & systemsSupply Cisco Access Point
Nexperia Malaysia Sdn Bhd
July 2026
- Supply 6 unit of Cisco AP - C9136I-ROW
Structured cabling & fibreNetwork Cabling at PH2A Waferbank
Nexperia Malaysia Sdn Bhd
June 2026 to ongoing Ongoing
- UTP cabling (Cat6) with termination modular jack & faceplate & patch panel
- Testing & configuration
CCTV, access & alarmEmergency Door System at Red Building
Samsung SDI Energy (Malaysia) Sdn Bhd
July 2026
- Emergency Door panel installation with programming & fire alarm module
- Alarm cable installation
- Siren, strobe light & breakglass installation
- Testing & configuration
Structured cabling & fibreNetwork Cabling at LIB#1
Samsung SDI Energy (Malaysia) Sdn Bhd
July 2026 to ongoing Ongoing
- UTP Cabling (Cat5e)
- UTP termination
CCTV, access & alarmRepair NG Security Item Equipment
Samsung SDI Energy (Malaysia) Sdn Bhd
July 2026 to ongoing Ongoing
- UTP Cabling (Cat5e)
- Access door system installation
- Alarm cable installation
- Testing & configuration
Structured cabling & fibreNetwork Cabling & Fibre Optic Cabling at Wong Loong Cheong Warehouse
Wong Loong Cheong Melaka Sdn Bhd
July 2026 to ongoing Ongoing
- UTP cabling (Cat6A)
- Fibre optic cabling (6 core)
- Equipment rack installation
CCTV, access & alarmCCTV Installation Project
G.B Industries Sdn Bhd (Sendayan)
June 2026 to July 2026
- UTP cabling (Cat6A)
- Bullet camera installation
- Testing & configuration
In-building coverageIn-Building Solution (IBS) Project at Faber Tower Taman Desa Old Klang Road
Kyocera Propel Network Sdn Bhd
June 2026 to ongoing Ongoing
- Feeder & hybrid cabling c/w termination
- Omni & Panel antenna installation
- Cable tray & trunking installation
- Power cabling
- Testing & configuration
In-building coverageIn-Building Solution (IBS) Project at Gurney Plaza Phase 2
Kyocera Propel Network Sdn Bhd
June 2026 to ongoing Ongoing
- Feeder & hybrid cabling c/w termination
- Omni & Panel antenna installation
- Equipment rack installation
- Testing & configuration
Structured cabling & fibreFibre Optic Cabling at Packing Area
G.B Industries Sdn Bhd (Sendayan)
April 2026 to ongoing Ongoing
- Access Point switch installation
- Fibre optic cabling (4 core)
- Testing & configuration
CCTV, access & alarmSupply CCTV Equipment for Splashmania Gamuda Cove
Gamuda Land Sdn Bhd
June 2026
- Supply network switch & industrial switch
- Supply CCTV bullet camera
- Supply UTP Cat6 cable, CCTV tester with crimping tools surge protector
Structured cabling & fibreNetwork Cabling at MF2 (Kitting Zone & Kiosk)
Samsung SDI Energy (Malaysia) Sdn Bhd
May 2026 to ongoing Ongoing
- UTP Cabling (Cat5e)
- Aluminium conduit pipe installation
- UTP termination
Structured cabling & fibreNetwork Cabling at Nestle MTT Shipping Logistic Sabah
Nestle Products Sdn Bhd
May 2026 to ongoing Ongoing
- UTP cabling (Cat6A)
- APC UPS installation
- 15U equipment rack installation
- UTP termination
Structured cabling & fibreFibre Optic Cabling at Post C to Post A
Nexperia Malaysia Sdn Bhd
May 2026
- Fibre optic cabling (6 core OM4)
- UTP cabling (Cat6)
- 6U equipment rack installation
- UTP & fibre optic termination
IT supply & systemsSupply Apple MacBook Neo & iPad Pro
Nexperia Malaysia Sdn Bhd
May 2026
- Supply Apple MacBook Neo (1 unit) & iPad Pro (1 unit)
IT supply & systemsInstall Projector
Nexperia Malaysia Sdn Bhd
May 2026
- Install Panasonic projector c/w bracket & hdmi cable
- Testing & configuration
IT supply & systemsInstall UPS at Level 9, Wisma Goldhill
Fronix Sdn Bhd
May 2026
- Supply labour to install UPS 3kVA
- Testing & configuration
Structured cabling & fibreNetwork Cabling at Guardhouse & PH1BE
Nexperia Malaysia Sdn Bhd
March 2026 to ongoing Ongoing
- UTP cabling (Cat6) with termination modular jack & faceplate & patch panel
- Testing & configuration
IT supply & systemsWi-Fi Network Router at Winding MF1-3 & MF2
Samsung SDI Energy (Malaysia) Sdn Bhd
March 2026 to ongoing Ongoing
- Fibre optic cabling (8 core)
- UTP cabling (Cat5e)
- UTP & Fibre optic termination
- Equipment rack installation (9u)
IT supply & systemsSupply Lenovo ThinkPad Laptop
Nexperia Malaysia Sdn Bhd
March 2026
- Supply 20 unit Lenovo ThinkPad E14 Laptop
CCTV, access & alarmPenggantian Interkom di Kompleks Sultan Abu Bakar dan Bangunan Sultan Iskandar
Jabatan Imigresen Johor (Hayfatech Solution)
January 2026 to ongoing Ongoing
- Fibre optic cabling c/w OTDR testing (4 core)
- UTP cabling c/w Fluke testing (Cat6)
- Power cabling
- Equipment rack & intercom installation
- Testing & configuration
In-building coverageIn-Building Solution (IBS) Project at Genting Sky Avenue & Genting Skyway
Kyocera Propel Network Sdn Bhd
January 2026 to ongoing Ongoing
- Feeder & hybrid cabling c/w termination
- Omni & Panel antenna installation
- Cable tray & trunking installation
- Power cabling
- Equipment rack installation
- Testing & configuration
CCTV, access & alarmStandalone Face Recognition System For Star Media Hub
Star Media Group
December 2025 to January 2026
- Standalone facial access control system installation with user & access card configuration
- Firefighting addressable system release door installation
In-building coverageIBC system installation at Genting Awana Village (Phase 1 Basement)
Kyocera Propel Network Sdn Bhd
July 2025 to August 2025
- Omni & Panel antenna installation
- Cable tray & trunking installation
- Walk test & antenna testing
CCTV, access & alarmInstall CCTV camera at Block A, Block B1, Block B2, Guardhouse & MO at Kalista 2 Seremban
Perbadanan Pengurusan Kalista 2
September 2025 to December 2025
- CCTV camera installation(21 unit bullet & 17 unit dome type)
- UTP cabling (Cat6)
- Testing & configuration
In-building coverageIn Building & Central (IBC) system installation at KL Gateway (Gohtong Station)
Kyocera Propel Network Sdn Bhd
Oct 2025 to ongoing Ongoing
- Feeder & hybrid cabling c/w termination
- Omni & Panel antenna installation with splitter, coupler & combiner
- Cable tray installation
- Testing & configuration
In-building coverageIn Building (IBC) system installation at Pejabat Peguam Negara WPPJ
Kyocera Propel Network Sdn Bhd
July 2025 to ongoing Ongoing
- Feeder & hybrid cabling c/w termination
- Omni & Panel antenna installation with splitter, coupler & combiner
- Cable tray & cable ladder installation
- Testing & configuration
Structured cabling & fibreFibre optic cabling at B3 Texas Instrument
Texas Instrument Ampang (Jaya Technology Services)
May 2025 to November 2025
- Fibre optic cabling (144 core & 12 core)
- Fibre optic termination
In-building coverageFeeder Cabling at BTSS
Universal Cellular Engineering Services
July 2025 to September 2025
- Feeder cabling c/w termination
- Omni & Panel antenna installation with splitter, coupler & combiner
- Cable tray & cable ladder installation
- Testing & configuration
Structured cabling & fibreFibre Optic Cabling at Nestle Chembong Ice Cream Factory
Nestle Manufacturing Malaysia (Chembong)
February 2025 to May 2025
- Fibre optic cabling (Singlemode & Multimode fibre)
- UTP cabling (Cat6A)
- Wire tray & cable trunking installation
- UTP & fibre optic termination
- Equipment rack installation
In-building coverageHybrid Cabling at WCOS
Universal Cellular Engineering Services
June 2025 to ongoing Ongoing
- Hybrid cabling & power cabling c/w termination
- Main ACDB installation c/w termination
- Cable tray & cable ladder installation
- Testing & configuration
IT supply & systemsInstall Network Switch & Access Point
G.B Industries Sdn Bhd (Sendayan)
February 2025 to August 2025
- Aruba HPE network core switch installation
- Aruba HPE access point installation
- Testing & configuration
In-building coverageIBC Installation Work at IOI Mall
Magicell Sdn Bhd
April 2025 to ongoing Ongoing
- Hybrid cabling & power cabling c/w termination
- Main ACDB installation c/w termination
- Cable tray & cable ladder installation
- Testing & configuration
IT supply & systemsSupply & Install APC UPS
G.B Industries Sdn Bhd (Sendayan)
February 2025 to August 2025
- UPS installation with power up testing
CCTV, access & alarmSetup CCTV & Control Room at Factory 2 (All Process)
Samsung SDI Energy (Malaysia) Sdn Bhd
May 2024 to December 2025
- Fibre optic cabling (8 core & 12 core)
- UTP cabling (Cat6)
- CCTV cameras installation (Dome, bullet & PTZ type)
- UTP & Fibre optic termination
- Equipment rack installation (42u & 15u)
- Cisco core switch installation with configuration
- Dell precision server installation with configuration
- Design & build videowall system at main control room (raised floor installation, console table & TV installation)
Structured cabling & fibreFibre Optic Cabling & Equipment Rack at GB Industries
G.B Industries Sdn Bhd (Sendayan)
January 2025 to February 2025
- 4 core fibre optic cabling
- Fibre optic termination
- Equipment rack installation (9u & 42u)
IT supply & systemsTroubleshooting SSM Client PC at MF1-3 & Safetylab
Samsung SDI Energy (Malaysia) Sdn Bhd
February 2025
- Troubleshooting PC
- Repair & configure windows PC
Structured cabling & fibreInstall Fibre Cassette at Data Centre Server Room
Texas Instrument Ampang (Jaya Technology Services)
November 2024 to February 2025
- Fibre cassette installation with patch panel, patch cable & cable manager
Structured cabling & fibreFibre Optic Cabling at MF1 DR Room Migration to MF2
Samsung SDI Energy (Malaysia) Sdn Bhd
November 2024 to February 2025
- 96 core Fibre Optic cabling
- Fibre optic termination
- Dismantle existing fibre optic cable
- Cable trunking installation
Structured cabling & fibreFibre Optic Cabling at Data Centre
Texas Instrument Ampang (Jaya Technology Services)
September 2024 to January 2025
- 96 core Fibre Optic cabling at 5 location
- Fibre optic termination
- Cable trunking installation
In-building coverageMobile Connectivity Boost
Kellogg Asia Products Sdn Bhd (Bandar Enstek)
September 2024 to January 2025
- Feeder cable installation
- Panel & Omni antenna with jumper cable & power splitter
- Nextivity Cel-Fi Quatra 4000e Multi-operator repeater installation & testing
- Provide signal coverage plot with testing
In-building coverageIBC Installation Works at Samsung SDI Energy
Imperium Solution Sdn Bhd
August 2024 to January 2025
- Feeder cable installation
- Panel & Omni antenna with jumper cable & power splitter
- Cable tray & cable ladder installation
Structured cabling & fibreInstall Panduit Rack at B3LG MDF
Texas Instrument Ampang (Jaya Technology Services)
October 2024 to January 2025
- 45RU 2-post rack installation with accessories
- Wire tray installation
Structured cabling & fibreTesting UTP cable at Putrajaya
Jaya Technology Services
December 2024 to January 2025
- Testing UTP cable with Fluke tester (DSX-5000)
Structured cabling & fibreInstall Open Rack at Data Centre
Texas Instrument Ampang (Jaya Technology Services)
November 2024 to January 2025
- Comrack 42u open rack installation
IT supply & systemsSetup CIM PC at Samsung SDI Energy
THiRA-UTECH Co, Ltd
June 2024 to October 2024
IT supply & systemsConference System at GF Factory 2
Samsung SDI Energy (Malaysia) Sdn Bhd
April 2024 to July 2024
- Cisco conference system with accessories (CS-KITPRO-PTZ4K-K9)
Structured cabling & fibreUTP & Fibre Optic Cabling at New Factory 2
Samsung SDI Energy (Malaysia) Sdn Bhd
August 2023 to September 2024
- UTP cabling (Cat5e)
- Fibre Optic cabling (144 core & 24 core)
- Wire tray, cable tray & trunking installation
- UTP & fibre optic termination
- Equipment rack installation (42u)
CCTV, access & alarmCCTV Camera Installation at Nestle Shah Alam
Nestle Manufacturing Malaysia (Shah Alam)
October 2024 to December 2024
- CCTV cameras installation (Bullet type)
- UTP cabling (Cat6)
- Equipment rack installation (6u)
Structured cabling & fibreNetwork Cabling at Milo Packing
Nestle Manufacturing Malaysia (Chembong)
December 2024
- UTP cabling (Cat6)
- Supply patch cord
CCTV, access & alarmTelescopic Arm Installation for Barrier Gate
Persatuan Penduduk Acacia Seremban 2
December 2024
- Telescopic arm installation for barrier gate
Structured cabling & fibreFibre Optic Cabling at TIM 2
Texas Instrument Ampang (Jaya Technology Services)
October 2024
- 12 core fibre optic cabling
- Fibre optic termination
- Fibre enclosure installation
Structured cabling & fibrePower Cabling at Trox Malaysia
Trox Malaysia (Ohms Venture)
October 2024
- Power cabling
- Wall mounted receptacle & voltage stabilizer installation
IT supply & systemsPA System at MF1 EV VD
Samsung SDI Energy (Malaysia) Sdn Bhd
August 2024 to September 2024
- Amperes slab mount & box speaker installation with speaker cabling & testing
IT supply & systemsInstall TV at PDP MF2 GF & 1F Formation
Samsung SDI Energy (Malaysia) Sdn Bhd
July 2024 to October 2024
- 43 inch & 55 inch Samsung TVinstallation with hdmi cable & customized ceiling bracket at 5 location
- UTP & power cabling
CCTV, access & alarmCCTV Camera & Card Access System at Office
Trinity Application
June 2024
- CCTV cameras installation (Dome & bullet type)
- Card access system (soyal keypad reader, proximity card, power adapter & push button)
- 2 pair telephone cable installation
CCTV, access & alarmConfigure Lightning Detection System
Kolej Tuanku Jaafar
April 2024
- Lightning detection system reconfiguration & testing
Structured cabling & fibreNetwork Cabling at Guard House
Unprofor Security Services Sdn Bhd
January 2024 to February 2024
Structured cabling & fibreMetal Trunking, RS-485 Cable & 10-pair Telephone Cable
Hyundai Elevator Malaysia
January 2024 to May 2024
- Metal trunking installation
- RS-485 & 10-pair telephone cabling
CCTV, access & alarmChange & Re-program TCP/IP System
Kolej Tuanku Jaafar
December 2023 to January 2024
- TCPIP system re-program & configuration
CCTV, access & alarmReplacement New Barrier Gate System
Persatuan Penduduk Acacia Seremban 2
March 2024 to April 2024
- Barrier gate system installation (with power cable, data cable & loop cable)
IT supply & systemsInstall Additional SSM Server
Samsung SDI Energy (Malaysia) Sdn Bhd
August 2023
- Setup Dell Precision 3930 rack with configuration & set servers domain
CCTV, access & alarmInstall Emergency Door System
Samsung SDI Energy (Malaysia) Sdn Bhd
June 2023
- Install customize emergency door panel with power supply, backup battery & fire relay module
- Power cabling & alarm cabling
- Key switch, breakglass, siren box & siren light
IT supply & systemsUpgrade Server System
SKF Bearing Industries (M) Sdn Bhd
- Display TV installation for CCTV system
- Install CCTV camera with network switch & network video recorder (NVR) at server room, guardhouse & office area
- CCTV system configuration with recording upgrade
No projects match. Clear the search or choose another type.